English ▾
Home / Anti-Corrosion Coating Robot

Line 05 · Magnetic Climbing Robot

Anti-corrosion coating robot

The recoating half of the maintenance cycle: dual-gun airless spraying at up to 800 sqm/h on vertical and curved walls, with 1,200 N of magnetic adhesion and closed waste recovery.

Line 05 · Magnetic Climbing RobotSpray rate 800 sqm/h dual-gunSpray width 300-1,000 mmAdhesion >= 1,200 N magneticDimensions 700 x 440 x 780 mm

Stripping is only half a maintenance window; this robot applies the new coating. It replaces manual high-altitude operations such as scaffolding and hanging baskets, eliminating the risk of falling, and uses permanent magnet adsorption technology to hold stably on vertical and curved walls — supporting 120-degree internal and external bending-angle crawling and 30 mm obstacle crossing, so tank shells and curved structures are coated in continuous passes.

The production figures: spray efficiency reaches 800 sqm/h in dual spray gun mode, stated as more than 4 times traditional manual labour, with support for 24-hour continuous operation. Airless spraying technology reduces the diffusion of paint mist, with a dust concentration of 5 mg per cubic metre or less, and the system synchronously closes and recovers waste paint slag, with a wastewater utilisation rate of 95% or more — the environmental controls that let coating happen inside working tank farms.

Published specification: spray paint width of 300–1,000 mm (adjustable), mobile speed of 4–8 m/min in operating mode, magnetic adsorption force of 1,200 N or more on a vertical wall, and overall dimensions of 700 x 440 x 780 mm. Pair it with any stripping crawler in the line — the tank rust removal robot is the natural partner — to run strip-and-recoat as one mobilisation.

Core advantages on record

  • High-altitude substitution — replaces scaffolding and hanging baskets; permanent-magnet adhesion on vertical/curved walls.
  • Spray production — 800 sqm/h dual-gun, 4x+ the stated manual rate, 24-hour continuous operation.
  • Clean application — airless spraying, dust <= 5 mg/cbm, closed waste paint recovery at >=95% utilisation.

Specifications

ItemSpecification on record
Spray efficiency800 sqm/h (dual spray gun mode)
Spray paint width300–1,000 mm (adjustable)
Mobile speed4–8 m/min (operating mode)
Adsorption capacityMagnetic adsorption force >= 1,200 N (vertical wall)
Overall dimensions700 x 440 x 780 mm
Wall geometry120-degree internal/external bending angles; 30 mm obstacle crossing

What to confirm for your project

  • Confirm coating system compatibility (airless, your paint viscosity and film build) at brief stage — spray width and rate assume the specified coating class.
  • Sequence it with stripping: the maintenance window math works when this robot follows the stripping crawler on the same mobilisation.
  • Ask about minimum order requirements and lead time for your proposed configuration.

Buyer questions

How much can it coat per hour?

Up to 800 sqm/h in dual spray gun mode — stated as more than 4 times traditional manual labour — with 24-hour continuous operation supported.

How does it stay on the wall?

Permanent magnet adsorption with a force of 1,200 N or more on a vertical wall, crawling through 120-degree internal and external bends and over 30 mm obstacles.

Is overspray controlled?

Airless spraying reduces paint mist diffusion (dust concentration <= 5 mg/cbm published), and waste paint slag is closed-loop recovered with a wastewater utilisation rate of 95% or more.

Related systems

SYS 26

Tank Rust Removal Robot

Strip first: Sa2.5 preparation at 15–70 sqm/h.

View the system →
SYS 24

Climbing Wall Robot

Jetting and blasting preparation across open walls.

View the system →
Blog

Wall-Climbing Robot Rust Removal

The full strip-to-recoat maintenance workflow.

View the system →
Product lines6 + motion cinema
Dome screensUp to 30 m across
Motion systems3-DOF to 6-DOF
Project modelDesign to after-sales

None

Tell us the product line, your venue or site conditions, the capacity you need and your target market. Ask about configuration, scope and project terms for your specific project before you commit.

Request a Quote