English ▾
Home / Blog

Engineering notes

Blog

Project notes and buyer guides from the flying theater, simulation and inspection lines.

Notes from the engineering side of the catalogue — choosing, installing, operating and maintaining flying theaters, dark rides, simulators, motion platforms, climbing robots and pipeline inspection systems.

2026-10-24

How to Choose a Flying Theater: Size, Screen and Seats

Most flying theater projects go wrong by choosing the ride before the building. This is the order that works: hall, capacity, screen, motion.

Read the post →
2026-10-24

Dome Cinema Installation Requirements: Height, Power, Floor

Dome cinemas are building projects with a ride inside. The installation requirements that decide feasibility — height, power, floor and structure — from the published specifications.

Read the post →
2026-10-24

Dark Ride Content Production: Scenes, Media and Effects

Scenes, media, effects programming and retheming: the four content workstreams behind a dark ride, and why each is a separate budget line.

Read the post →
2026-10-24

Motion Platform Maintenance: Keeping 6-DOF Bases Honest

A motion platform's accuracy is a maintenance outcome. The service rhythm that keeps repeatability, response and safety where the specification put them.

Read the post →
2026-10-24

Wall-Climbing Robot Rust Removal: The Strip-to-Grade Workflow

From rust assessment to a Sa2.5 surface ready for coating: the workflow a climbing robot runs on a tank or hull wall, with the published rates at each step.

Read the post →
2026-10-24

The MFL Pipeline Inspection Process, Step by Step

An MFL survey is won or lost before the tool enters the pipe. The full process — preparation, run, analysis, verification digs — as it runs on a real line.

Read the post →
2026-10-24

Earthquake Simulation Platform Applications: What Gets Tested

A 120-ton shaking table is bought for specific test programmes. The application families that justify one — and what each programme actually runs.

Read the post →
2026-10-24

LED Dome vs Projection Dome: An Honest Comparison

Both make a hemisphere glow. They differ in almost everything else: light path, sound, upkeep and where each one wins. The comparison, with numbers.

Read the post →
2026-10-24

Motion Cinema Seat Maintenance: Keeping Dynamic Seats in Service

A motion seat earns money only while it moves in sync. The maintenance rhythm for dynamic cinema seating — mechanisms, effects, hygiene and show control.

Read the post →
2026-10-24

Simulator Training Safety: People, Motion Bases and Procedures

A training simulator moves real people on real machinery. The safety disciplines — screening, envelopes, stops and supervision — that keep programmes incident-free.

Read the post →

None

Tell us the product line, your venue or site conditions, the capacity you need and your target market. Ask about configuration, scope and project terms for your specific project before you commit.

Request a Quote